Location: Muswellbrook, NSW

Project Description:

Complete concrete works for new water treatment facility at Muswellbrook.

Products Supplied:

Entire Concrete supplied all concrete for the job, around 3500 cubes.

Specialised spec mixes including Bonacci and Aurecon mix

840 cubic meters supplied in 1 day for continuous poor in 9 hours.

Work includes:

  • Idal Tank

Concrete Mixes Used:

  • S40/20 120 slump Bonacci spec
  • S40/20 95 slump Aurecon spec
  • Normal class concrete 20/10, 25/10
  • Kerb and Gutter

Testing:

Comprehensive  slump, shrinkage and compression testing carried out throughout the job by third party tester Qualtest.

Muswellbrook Hospital

Location: Muswellbrook, NSW

Project Description:

Complete concrete works for the upgrade of the Muswellbrook Hospital.

Products Supplied:

Entire Concrete supplied all concrete for the job, around 3000 cubes.

336 cubic meters supplied in 1 day for continuous pour.

Work includes:

  • Upgrade to emergency services

Concrete Mixes Used:

  • N40/20
  • N32/20
  • Normal class concrete 20/10, 25/10
  • and more

Testing:

Comprehensive  slump, shrinkage and compression testing carried out throughout the job by third party tester Qualtest.

Muswellbrook Hospital
Muswellbrook Hospital
Muswellbrook Hospital

Location: Singleton, NSW

Project Description:

Complete concrete works and pump hire for a new Singleton Hospital upgrade at Singleton.

Products Supplied:

Entire Concrete supplied all the concrete and the 43m boom pump for the complete job.

Work includes:

  • Slab
  • Suspended Slab

Concrete Mixes Used:

  • 25/10, 32/10, 32/20, 40/10 Mpa
  • Kerb and Gutter
  • Blockfill

Testing:

Comprehensive  slump and compression testing carried out throughout the job by Coffey International.

Location: Singleton, NSW

Project Description:

In October 2013, the NSW Government awarded a $9 million grant to Singleton Council for the revitalisation of the Singleton Town Centre under the Resources for Regions program. Council had already committed $2 million to the project to commence planning and design.

Stage one of the project extends down John St from Hunter St to Gowrie St and combines civil, electrical, architectural, landscaping and mechanical elements.

Products Supplied:

Entire Concrete supplied all the concrete and the 43m boom pump for the complete job.

Work includes:

  • Extending footpath areas and introducing new pavement and the introduction of raised pedestrian crossings.
  • New garden beds and rain gardens will be established with more than 70 new trees and 2000 plants, using state of the art watering systems that use stormwater.
  • Modern street furniture, including more than 60 new benches, drinking fountains, and bike racks will also be installed.
  • The street lights will be upgraded by removing the existing street lights and replacing them with modern LED type lights as well as adding dedicated lighting to the footpaths in awning areas.
  • The speed limit for a section of John St will be reduced to 40km/h and dedicated parking including spaces for people with disabilities will be provided.
  • Selected sections of the John St road pavement will be improved following detailed geotechnical investigations undertaken earlier this year.
  • Wayfinding signage, including maps of the town centre, will be introduced to assist motorists and pedestrians with getting to their desired location.

Concrete Mixes Used:

  • 25/20 Mpa
  • Kerb and Gutter
  • 32/20 Mpa
  • Pavement Mix 10mm
Civic Avenue Early Learning Centre

Location: Singleton, NSW

Project Description:

Complete concrete works and pump hire for a new childcare centre at Singleton.

Products Supplied:

Entire concrete supplied all the concrete and the 43m boom pump for the complete job.

Work includes:

  • Slab
  • Carpark
  • Footpaths

Concrete Mixes Used:

  • 25/20, 20/20, 25/10, 32/20 MPa
  • Kerb and Gutter
  • Blockfill
Civic Avenue Early Learning Centre
Civic Avenue Early Learning Centre
Civic Avenue Early Learning Centre
Civic Avenue Early Learning Centre
Civic Avenue Early Learning Centre
Civic Avenue Early Learning Centre
New Wallsend Ambulance Station

Location: Wallsend, NSW

Project Description: Designed by DRJD Architects, the project includes: internal parking for up to six emergency ambulance vehicles; administration and office areas; staff amenities; multi-purpose meeting training room; logistics and storage areas; external wash bay; deliveries and loading bay; and staff parking.

Concrete Used:

32/20, 25/20, 40/20, 25mpa & 32 mpa Blockfill, Kerb and Gutter Mixes

Testing:          

Comprehensive  slump and compression testing carried out throughout the job by Coffey International and Qualtest

New Wallsend Ambulance Station
New Wallsend Ambulance Station
New Wallsend Ambulance Station
New Wallsend Ambulance Station
Wangi Wangi School Upgrade

To view the project overview document – click here.

Location: Wangi Wangi, NSW

Project Description:

  • Six new permanent, flexible and innovative learning spaces.
  • Refurbishment of the existing hall into special programs spaces.
  • A new administration building and staff amenities.
  • A new canteen.
  • A new hall.

Products Supplied: Normal class concrete: 25/20, 32/20, 40/20, 32/10, 15/10, 20/10, 25/10, 50/20.

Topping 32/7, Kerb and Gutter Mixes.

Testing:

Comprehensive  slump and compression testing carried out throughout the job by Coffey International and Qualtest.

Project Overview Video

Location: Myambat, NSW

Project Description:

Two new earth covered bunkers constructed adjacent to the existing bunkers at Defence Establishment Myambat. They ugment the existing storage capacity to meet the projected demand for the F-35A ordnance.

A frangible counter measure storage facility is to be constructed for the wholesale storage of F-35A counter measures.

Products Supplied: Normal class concrete: 15/20, 20/20, 25/20, 32/20, 40/20, 40/10, 50/10, 50/20, 60/20. 50/20 120 Slump

Testing: Comprehensive slump and compression testing carried out throughout the job by Coffey International and Qualtest

M1 Motorway Upgrade

Location: Beresfield, NSW

M1 Motorway Upgrade (Weakleys Drive and John Renshaw Drive Intersection)

Project Description: The upgrade involved the replacement of the existing roundabout intersection with traffic lights to improve traffic flow, travel times and motorist safety.

Full scope of works for the project includes:

  • the replacement of the roundabout with traffic lights;
  • construction of two through lanes on all approaches;
  • construction of additional turning lanes on all approaches, including two right turn lanes from the motorway to John Renshaw Drive;
  • the extension of the two northbound lanes on Weakleys Drive from the traffic lights to Enterprise Drive;
  • the upgrade of the existing left-turn slip lane from John Renshaw Drive to the motorway;
  • the addition of a new left-turn lane from John Renshaw Drive to the motorway; and
  • additional on-road provisions for cyclists.

The project is a part of RMS’ M1 Productivity Package ($391.6 million) funded by the Federal and NSW State governments to improve overall traffic flow and safety on the M1.

Products Supplied: Normal class concrete: 25/20, 32/20, 40/20, 32/10, 15/10, 20/10, 25/10, 50/20.

RMS Mixes: RMS R83 32/10mm, RMS R83 25/20mm, RMS B80 40/20, RMS B80 50/20

Kerb and Gutter Mixes, Stabilised Sand Mixes, No Fines, High Early Strength 50/20,

Slipform 32/20, Flowable Fill.

Testing: Comprehensive  slump and compression testing carried out throughout the job by Coffey International and Qualtest

M1 Motorway Upgrade
M1 Motorway Upgrade
M1 Motorway Upgrade
M1 Motorway Upgrade
Hunter Valley Grammar School

Location: Maitland, NSW

Hunter Valley Grammar School Cafe and Music Rooms Upgrade

Project Description: The facility, which is situated in the middle of the school, consists of a commercial kitchen and dining hall on level 1; musical classrooms, practice rooms, amenities and a coffee bar on ground level; and extensive landscaping to the surrounds.

The project was a success and completed ahead of contract programme – much to the joy of our client who now had the full school holidays to prepare the facilities for Term 3, 2020.

Products Supplied:    

Kerb and Gutter mixes, 32/20, 25/20

Testing: Comprehensive  slump and compression testing carried out throughout the job by Coffey International and Qualtest